Purpleplane
Well-known member
Work is continuing on the parking garage. All of the gray and white for the exterior has been completed, and I'm in the process of applying the black between the different levels. I've also test-fitted the sheets for the parking spaces on the 5th level:
Section 10 masked off in preparation for black paint

A view of the 5th level with parking spaces:

East end:

West end:

Another view of the 5th level from the east end:

South end:

North area where the skybridges join the terminal:

One last view of the 5th level
Southeast end with the up (right) and down (left) ramps:

I'll post more as I finish up the garage.
Section 10 masked off in preparation for black paint

A view of the 5th level with parking spaces:

East end:

West end:

Another view of the 5th level from the east end:

South end:

North area where the skybridges join the terminal:

One last view of the 5th level

Southeast end with the up (right) and down (left) ramps:

I'll post more as I finish up the garage.