Starz10p Aviation
Well-known member
Hey all! Thought I would make a thread for you guys to share regular construction updates on your local airport, or any other airport. The US alone is full of big airport construction projects right now, and I will be using this thread to share progress on the new KRDM terminal. Feel free to make similar updates/ talk about other airports in this thread!
KRDM (Redmond, OR) CONSTRUCTION UPDATE


The old extension to the terminal (indoor path to access gates 8-11) is currently being demolished, with the asphalt in the area where the new terminal is going to be located now being dug up, it looks like they are prepping to put in the first foundations. Current project ETA is 2027/2028.
KRDM (Redmond, OR) CONSTRUCTION UPDATE


The old extension to the terminal (indoor path to access gates 8-11) is currently being demolished, with the asphalt in the area where the new terminal is going to be located now being dug up, it looks like they are prepping to put in the first foundations. Current project ETA is 2027/2028.